Welcome To

Archive for April, 2011

CSi Responds to Release

Monday, April 25th, 2011

CSi was contracted this day by a major gas transmission company to respond an oil release at a compressor station facility.  Clean-up activities are currently underway.

CSi Adds New Drilling Rig to Fleet

Monday, April 18th, 2011

CSi recently added a GEFCO Speedstar 185 to its rig fleet (designated as Rig #10). Commenting on this latest equipment addition, CSi’s President stated: ” Over the last several years, we have witnessed the rig market and technology change from using a conventional rotary rig to drill vertical wells to using hydraulic top-head drive rigs to drill horizontal wells. Because we foresee horizontal wells as being the future of the Appalachain Basin, we opted to purchase a rig better-suited in doing so.  We believe the Speedstar 185 is ideally suited for the formations we intend to target over the next several years and will allow Reserve to tap into previously inaccessible areas for gas and oil.”

Copyright © 2007 Contractor Services, Inc.

Members of:

Isnet World Member Vendor PICS Auditing

web design by NeoNexus Designs
Web Design Company