Conserv Company News

ConServ Completes Pipeline Integrity Project in PA With Innovative Methane Capture

ConServ recently completed a pipeline integrity related project (i.e., PIG tether pull) in PA for a major natural gas transmission company. ConServ utilized β€œnew” natural gas recovery methods to capture potential natural gas emissions (line pack) and transfer it to an active section of a neighboring gas pipeline. Normally, natural gas would have been isolated between valves and blown to the atmosphere to prepare the line for inspection.